The total amount of time needed to complete the waterproofing system installation should be considered when exploring the various product options. Each waterproofing system option is different, especially when comparing cold-applied versus hot-applied waterproofing systems.
How Contractors Can Make the Most of the American Jobs Plan
With the American Jobs Plan on the horizon, contractors should begin thinking about doing business with public sector agencies (small and large) that will gain enormous spending power.
Good News on Prices for Some Construction Materials
The elevated price of softwood lumber, a major talking point during much of the pandemic, has fallen below $900 per board feet as pf June 23.
Can Congress Finally Agree on a Bipartisan Infrastructure Package?
On June 24, a bipartisan group of U.S. Senators and the White House reached an agreement on a framework for an infrastructure package that would provide approximately $1 trillion to address the needs of the nation’s most critical infrastructure.
All Signs Point to a Bright Future for Modular Construction
Despite so many aspects of the economy and our daily lives stalling during the pandemic, modular construction took off. The need to rapidly add or adjust space paved the way for modular solutions.
Five Significant Obstacles to Pipeline Surveys
Surveys, especially aerial ones, have to be completed properly if they are going to have any value. Through the use of UAVs, surveys can be completed faster and more cost-effectively, with greater levels of speed, accuracy and safety.
Multi-Generational Living Is Not Only Common—It Is Increasingly Popular
By the end of 2020, one in three 18- to 34-year-olds were living with their parents, illustrating the statistical rise in multi-generational living over the past half-century.
The Future of the Public Restroom
Facilitating a hygienic, ecologically responsible and inclusive restroom experience in the post-COVID-19 world.












