Determining who controls contingency funds and what costs can be charged is a project-specific determination depending on the needs of the project and views of the project participants.
Liquidated Damages: Six Points Contractors Should Understand
Here’s practical guidance on how contractors can manage liquidated damages.
Ten Strategies for Mitigating Liability and Avoiding Construction Disputes
Construction professionals can plan and prepare for potential disputes in advance. Here are 10 tips all construction professionals should consider to mitigate their liability in the event a dispute later arises.
The Best Cash-Flow Fixes Come Before the Project Starts
It’s crucial that contractors set themselves up for successful cash flow. Here are some ways contractors can set themselves up for cash flow success before stepping on the jobsite.
Fixing That Mistake
Spoliation, manipulation or elimination of evidence can expose a contractor to liability and damages.
Protection Against Escalating Material Costs in the Construction Industry
Contractors are increasingly exposed to financial risk through material costs escalation. Understanding their options can lessen the risk of material cost increases.
Mitigating the Risks of Materials Price Escalation: Better Now Than Never
All stakeholders should collaboratively work to mitigate the risks of price escalations by drafting and negotiating contracts that share and transfer such risks fairly and equitably to all the parties.
Alternative Dispute Resolution: The Differences Among Mediation, Litigation and Arbitration
Many contracts include mediation, litigation or arbitration, so it pays to understand each procedure.











