If artificial intelligence is a game changer for humanity, then the data centers that enable it (along with cloud computing and digital transformation overall) are having a similarly profound influence on the construction industry.
Construction firms that expect to get in on the action must get up to speed fast on the complexities inherent to this booming market. That requires them to understand the many risk factors involved, as well as the essential role of insurance (and experienced broker partners) for managing them optimally.
Here’s what firms need to understand about data center projects, from their unique exposures to insurance requirements and market dynamics, to gain a competitive advantage moving forward.
Massive Growth Ahead
Data center projects are growing at an unprecedented rate.
In 2025, U.S. data center construction spending hit an all-time high of billion; global growth is expected to continue unabated, as global data center power demand more than doubles by 2030. Average project costs have climbed from between 0 million and 0 million in 2020 to 0 million and 0 million today, with major hyperscale campuses running between billion and billion.
As the price tags suggest, data center projects are considerably more complex than typical construction projects. At 20 to 30 times larger, there’s massive value represented in tight geographical areas. One catastrophic event during construction can trigger huge losses.
Consider construction delays, a concerning and manageable traditional construction issue. There are extreme time constraints for data center projects as hyperscaler tenants wait for projects to come online. Schedule risk is equivalent to business risk as delays put millions of dollars in potential revenue at risk.
The defining factor for data centers is power or megawatt capacity, not square footage. In fact, demand has increased from 50-100 megawatts to hundreds of megawatts for the average facility, a gigawatt (1,000 megawatts) or more for hyperscale projects, with AI campuses pushing into multigigawatt territory. Many larger campuses today are being built with their own dedicated powerplant and all related power generation equipment.
The power infrastructure alone represents a significant fire and explosion hazard, with diesel fuel systems distributed throughout the facility that pose both operational risk and insurance complexity.
Concentrations of Risk
Insurance structuring and loss prevention for data center projects require a good understanding of where risk concentrates across the project lifecycle. Here’s an overview:
- Development and Design: Organizations building data center campuses at scale are engaging insurance advisors early during site acquisition and design in order to structure programs that protect development-stage obligations before a shovel breaks ground. Power procurement and grid interconnection decisions made at the development stage carry significant financial implications. Structuring the right protections early ensures that capital commitments are covered from the moment obligations are made and then adjusted continuously for project delays and changes in values
- Construction Phase: The single largest concentration of risk lies with mechanical, electrical and plumbing systems, a scope that can run to billions of dollars on its own and puts real pressure on contractors’ surety and insurance capacity. A failure can take the facility offline fast. Tenant fit-out values add to that including raised floors, power and cooling distribution, cabling infrastructure, and cage buildouts, reaching as much as 70% of the shell and core phase value.
Equipment lead times are compounding the problem. Large power transformers are running three to five years out, medium-voltage switchgear 60 to 80-plus weeks, AI GPU hardware 12 to 18-plus months. About 40% of planned U.S. data center capacity is currently delayed, and equipment shortages are the primary reason. GPU and computer hardware now represent the majority of total completed project values.
- Commissioning, Testing, Fit-Out and Occupation: Unique risks are created during the commissioning stage, when all systems must integrate and function together. Transitioning from builders risk to operational property coverage is particularly complex when data halls are completed and turned over to tenants before full building turnover.
- Operations and Maintenance: The contractor capacity crisis is an ongoing challenge, causing intense carrier scrutiny over contractor experience, and whether they are scaling too quickly to maintain quality control. Another issue is the conflict between aggressive schedule pressure and quality control requirements. There’s also a newer hazard that doesn’t get enough attention: 800V high voltage direct current infrastructure. The arc flash and electrocution risks it creates don’t fit neatly into existing OSHA standards—residual capacitor voltage after apparent shutdown, arc flash energy levels that exceed standard AC safety tables. Liquid cooling adds another layer, with hydrogen fluoride generation under arc flash conditions and pressurized system failure risk. Hot works protocols matter.
- Decommissioning and End of Life: End-of-life transitions carry distinct exposures that standard operational policies do not address. Decommissioning coverage closes the tail-risk gap across data destruction liability, environmental closeout and contractual performance obligations.
Be Aware of Coverage Considerations
Contractors and project owners alike must be aware of several crucial data center coverage considerations. The issue goes beyond what specific coverage to buy; it also includes understanding why conventional approaches to coverage may not be relevant to this market. Four particular areas are important:
- Contractor Performance Risk—Project values are escalating faster than surety market’s ability to bond them. Project owners and general contractors should consider requiring subcontractor surety bonds or SDI for critical-path subcontractor scopes. If a subcontractor defaults, finding a qualified replacement could take several months, and that delay alone can be a project-ending event.
- Builders Risk Insurance—As the data center insurance market evolves, the potential for significant losses is only growing. Securing proper coverage, with adequate limits and terms, is more critical than ever. Securing coverage for the full value of a project may not be feasible. Testing and commissioning extensions, delay-in-completion/soft cost coverage sized to actual project economics, and coverage limits aligned on phased projects with the total values exposed at one time.
- General Liability—Then there are other potential risks requiring specific expertise. These include owner-landlord-tenant complexity and meticulous contract drafting for risk allocation through all phases of development, design, construction and commissioning. A contractor-controlled insurance program may be needed to provide adequate limits and coverage for all parties.
- Cyber Liability—Most people think of cyber as an operational risk. It isn’t, and it does not start exclusively after project completion. Building automation and management systems get commissioned and networked months before a facility opens, which means the attack begins well before the first tenant moves in and the breach is discovered. Standard CGL forms don’t cover that gap. A cyber policy that accounts for the construction phase and carries through to operations isn’t a nice-to-have, but a missing piece in most programs.
From the Underwriting Perspective
Seek broker partners with deep expertise in the rapidly evolving risk landscape of data center construction. Beyond delivering critical insights into emerging exposures, the right partner will serve as a trusted advisor, helping your firm understand carrier priorities and positioning you for a stronger underwriting outcome.
For example, underwriters want to see proven contractor experience with data center construction at scale. This encompasses loss history on similar projects and financial capacity, along with evidence that the contractor isn’t growing too rapidly to maintain both safety and quality.
A quality risk management program is critical, spanning comprehensive site safety programs, hot works protocols, quality control procedures, open communication and close coordination around safety.
Finally, business continuity planning must be completed before construction starts, including hurricane, tornado and catastrophe-event protocols; pre-incident planning with local fire departments; post-loss recovery and reconstruction contractor identification in advance; and emergency supply chain risk planning.
Post-loss planning deserves the same rigor. According to an Uptime Institute survey, 37% of contractors that experienced a significant outage saw costs exceed initial estimates by more than 50%. The gap wasn’t the direct property loss—it was SLA penalties, tenant attrition and extended business interruption driven by equipment lead times that nobody had pre-quantified. Knowing what a loss will actually cost, before it happens, is part of the program.
Data center projects are among the most complex and high-stakes builds in the construction industry today. Firms that move early, engaging the right broker partners, structuring coverage before ground breaks and planning for loss before it happens, will be the ones best positioned to capture opportunity in this booming market. Those that don’t will find that the risks, not the rewards, define their experience.
SEE ALSO: DATA CENTER DEMAND IS CREATING A TALENT CRISIS ACROSS THE REST OF CONSTRUCTION







