Working Backward From a Construction Budget With Target Value Design
Target value design lets the budget drive design decisions early in preconstruction. The concept allows the entire preconstruction team to begin with a validated,
Work Backward From a Budget With Target Value Design
Target value design is an approach in which the budget drives design decisions and occurs very early in preconstruction. The concept allows the entire preconstruction